MMI Engineered Solutions Moves Forward with Facility in Mexico

  • 35,000 sq. ft.

–Injection Molding & Asm

  • Up to 1500 Ton

–Heavy Crane installation, floor construction and utilities set-up to add another approx. 10+ molding machines.

Initial operations will run two shifts per day/5 days per week.

  • Our general timeline shows the following:

–Facility move-in: March 1st , 2016

–Begin Distribution of the Silverback Splash Shields April 1st, 2016

–Molding machine/infrastructure installation May, 2016

–Facility certification June, 2016

–Re-PPAP of Navistar product previously PPAP’d from our Saline, MI facility in July, 2016

–Start of Production of all Navistar product, August, 2016

–Begin Production shipment ready September, 2016